2910 17th St. Boulder, CO.

Report ID: R-00309

Date: 03.04.2022

Tech Name: CAD

Comments

We used Schedule 45 Pipe from the house to the street. The City Main Sewer was 4 Foot deep and we used a Saddle 10×4 and 1.5 Foot of SDR-35 Pipe.

The distance from the House to the City Main Sewer was 52 Foots.

Photos